工程项目
2020

West Island Line, Hong Kong (CN)
West Island Line, Hong Kong Tuned at 560Hz, vertical and lateral direction 200m damper section 300m …
2020
2019

London Underground Trial (CN)
London Underground Trial Tuned at 560Hz 200m damper section 300m track curvature High attenuation ba…
2019
2018

Zurich (CN)
Zurich Tuned at 560Hz 100m damper section Straight Track Booted wooden sleeper ½ damper per rail sup…
2018
2017

West Rail Line, Hong Kong (CN)
West Rail Line, Hong Kong Tuned at 500-1000Hz 80m damper section 2000m track curvature Floating slab…
2017
2016

East Rail Line, Hong Kong (CN)
East Rail Line Tuned at 500-1000Hz 100m damper section 250m track curvature Concrete sleeper on ball…
2016
2015

Kwan Tong Line, Hong Kong (CN)
Location: Kwan Tong Line (Hong Kong) Noise Reduction: -3 to -6 dB(A)
2015
2012
2010

Kwun Tong Line, Hong Kong (CN)
Location: Kwun Tong Line (Hong Kong) Noise Reduction: -3 to -6 dB(A)
2010