Thompson East Cost Line, Singapore

80% Rail Corrugation Growth Suppression
Corrugation were measured by Corrugation Analysis Trolley at 1 – 6 months after grinding. Corrugation growth rate is compared between damper and control section at the same curve with the same curvature. 80% corrugation growth rate reduction is achieved. Detail measurement data will be published once the project is finailised.


